What We Do
We deliver a full range of specialist site investigation, testing, and monitoring services to support safe, compliant, and cost-effective development.
From ground assessments and CBR or Plate Bearing Tests, through to vibration monitoring, flood risk assessments, and contaminated land strategies (Phases 1–4), our experienced engineers provide clear data, expert guidance, and actionable reports.
Whatever stage your project is at, we’re here to help you move forward with confidence. View our offerings below.


CBR Testing Services
California Bearing Ratio (CBR) Testing is essential for assessing the strength of soils, subgrades, and sub-base materials in road, pavement, and site development projects.
We deliver CBR testing in line with BS 1377-4:1990, providing accurate results that help verify ground conditions, ensure compliance with design specifications, and reduce the risk of future settlement or failure.
Our experienced engineers offer both in-situ and laboratory testing, with clear, reliable reporting to support safe and cost-effective construction.
Construction Vibration Monitoring
Mitigate risks and maintain peace of mind with our Construction Vibration Monitoring.
We harness state-of-the-art, real-time vibration monitoring systems to safeguard structures, support regulatory compliance, and inform timely decision-making.
With continuous data collection, live alerts, and comprehensive reporting, your project stays on track, smoothly and securely.

Flood Risk Assessment
Gain confidence and clarity with our Flood Risk Assessment, an in-depth evaluation of flood hazards aligned with NPPF standards.
By analysing past events, terrain features, weather patterns, flood zones, and climate forecasts, we equip you with actionable insights and mitigation plans.
Those plans help fast-track planning approvals, cut delays, and guide informed site design.


Phase 1 Desk Study Services
Lay a firm foundation with our Phase 1 Desk Study, delivering early-stage insight via meticulous analysis of site history, geology, and environmental data.
Designed to ascertain contamination risk, guide site development, and satisfy planning requirements, this service offers clarity before you commit to further investigations.
Phase 2 Site Investigation Services
Dig deeper with our Phase 2 Site Investigation, where intrusive site surveys and targeted lab testing deliver precise insight into contamination and geotechnical conditions.
This essential service builds on desk study findings to guide safe, compliant development, ensuring you move forward with confidence.
Want clarity beneath the surface? Let’s explore together.

Phase 3 Remediation Strategy Services
Secure safe and compliant development with our Phase 3 Remediation Strategy.
Building on desk studies and site investigations, we design targeted plans to break pollutant linkages, protect human health, and ensure regulatory approval.
From bioremediation to excavation, our tailored strategies provide a clear, cost-effective route to site remediation.


Phase 4 Verification Report Services
Ensure complete compliance and peace of mind with our Phase 4 Verification Report.
This final assessment confirms that remediation has been successfully executed, pollution targets met, and the site is safe for its intended use.
Ready to verify and close out your site with confidence? Get started with us!
Plate Bearing Testing
Ensure stability from the ground up with our Plate Load Testing service according to BS 1377-9:1990.
Whether it’s crane bases, piling mats, or compacted sub-base layers, our precision testing delivers the data you need to confirm bearing capacity and compaction integrity.
Want assurance before load-out?

Accreditations
FAQs
- Can vibration monitoring data be accessed in real-time?
Our modern systems provide real-time data access, allowing you to monitor vibrations live and receive instant alerts if thresholds are exceeded – keeping you in the loop and on track throughout.
- Do I need a Phase 1 Desk Study before a Phase 2 Site Investigation?
Yes, we would recommend that a Phase 1 Desk Study is completed as the initial stage of any contaminated land assessment. This study can help establish the likelihood of any contaminants being present and inform the scope and extent of the Phase 2 Site Investigation. In some cases, it may indicate that a Phase 2 Site Investigation is not necessary.
- Do I need CBR testing or Plate Bearing testing?
CBR testing is typically required for roads and pavements, while Plate Bearing testing is often used for crane bases, piling mats, or heavily loaded areas. SEP Technical can advise on the best option for your project.
- What is an FRA?
A Flood Risk Assessment (FRA) is a report that looks at the risk of flooding for a specific site and how it will affect or be affected by development.
- Why do I need a surface water drainage strategy?
You need an SDS if your development includes surface water drainage or is in an area prone to flooding.





